COMMUNITY HEALTH AND RESOURCE CENTRE

project showcase

Closed modern gray elevator doors at the end of a hallway with a beige floor, black metal railing on the left, a bright green wall on the left background, and a white wall with a window ledge on the right.

COMMUNITY HEALTH AND RESOURCE CENTRE
ECO PUBLIC LIFT

Status: Completed
Lift Type: ‍Commercial Lift
We installed this ECO Public Lift for a vibrant community hub. Serving two floors beside the main staircase, the client selected a glass-and-steel structure, finished in RAL 7040 to maximise natural light and maintain the building’s bright, open environment.
Technical top-view blueprint of an elevator shaft and car layout with detailed measurements and labels for shaft width, car width, depth, and various component dimensions.
Two gray circular icons stacked vertically, each containing a solid gray triangle; the top circle has an upward-pointing triangle, and the bottom circle has a downward-pointing triangle.
3
STOPS
Vertical double-headed arrow pointing up and down between two horizontal bars, symbolizing height or vertical measurement.
2800 MM
TRAVEL
Gray semicircular speedometer gauge icon with a needle pointing towards the upper right.
0.15 M/S
SPEED
Solid gray weight icon resembling a trapezoidal weight with a circular hole at the top center.
300 KG
RATED LOAD
Closed stainless steel elevator door set in a modern building hallway with light gray walls and a staircase with black metal railings on the right side.Modern glass-enclosed public platform elevator shaft with visible metal framework inside a building, featuring closed elevator doors at the bottom and a white ceiling with grid panels above.Closed modern gray elevator doors at the end of a hallway with a beige floor, black metal railing on the left, a bright green wall on the left background, and a white wall with a window ledge on the right.Interior of an elevator with visible metallic walls, a horizontal handrail, a panel with illuminated floor buttons, an emergency stop button, and an open/close door control outside the elevator with a green light around the up and down arrows.Closed silver metal elevator doors with a control panel on the left showing a blue floor indicator displaying zero and a green-lit button with up and down arrows.A silver metal elevator door next to a staircase with black metal railings and beige stairs with metal edge strips inside a modern building.

INSTALLATION

Open flatbed truck loaded with large wooden crates and multiple cardboard boxes labeled Farmator, secured with yellow and orange straps.Wooden crate covered with yellow plastic wrap on rough ground near a weathered wooden fence with a sign stating 'FULL PPE TO BE WORN ON SITE', a fragile label is visible on the crate.Rusty metal scaffolding structure inside unfinished room with partially plastered white walls and exposed pink ceiling panels, next to a large open window showing an outdoor construction area.Premier Lifts Ireland engineer wearing a white hard hat and high-visibility yellow vest kneeling on a concrete floor while using a power drill to fasten a metal frame inside a building under construction with tools scattered around.Interior of a building under construction showing a sturdy metal frame installation with scaffolding inside, wooden stairs with a handrail in the foreground, and two Premier Lifts Ireland engineers wearing high-visibility jackets standing inside a dark doorway in the background.Interior construction scene showing scaffolding built inside a metal frame structure with wooden planks, unfinished walls, and a partially painted ceiling.Metal and wood scaffolding structure inside a building under construction, with gray painted metal beams and a partially finished ceiling.View looking up inside an unfinished elevator shaft showing metal guide rails and cables against walls with exposed drywall.Partially constructed elevator shaft with visible metal framework and electrical components, a red spirit level resting on the metal support, and a white hard hat placed on the framework, inside a building under construction.Closed modern silver metal elevator doors set within a gray frame, with an elevator call button panel on the right side.Premier Lifts Ireland engineer wearing a white hard hat, black gloves, and a yellow safety vest inside a glass elevator shaft, holding suction tools and standing on the elevator platform during installation or maintenance.Interior view looking up inside an empty glass elevator shaft showing metal framework, cables, and the ceiling with tiled panels and lights.Modern glass and metal public elevator shaft with closed silver elevator doors and control panel in a building interior under construction, with wooden scaffolding nearby.Interior view of a public elevator shaft showing metal framework and mechanical components behind a glass panel inside a building with beige walls and a tiled ceiling.Modern indoor elevator with glass walls and metal frame, open door showing the cabin with control panel and cardboard on the floor.View of an elevator shaft with metal framework and a no smoking sign on a glass platform, reflecting a person in a yellow safety vest taking the photo.

tell us about your project

If you would like to request a quotation or find out more about Premier Lift Group, contact our team on
‍020 3355 0523 or info@premierliftgroup.co.uk