eit platform lift
review 11/03/2026
premier lift group
LEADERS IN LIFT DESIGN

Partners in attendance



Design discussion with foster + partners
started in 2022
providing disabled access to top level of theatre



early concept design
Design needed to move away from the standard commerical platform lift options.




design challenge 01
mechanicals cannot continue past top floor ffl
clear 1000mm access needed next to the lift

'pop-up' solution required





pop up solution typically
uses hydraulics & requires a deep pit depth

hydraulic technology
switched to rigid chain system by serapid


updated design with no adjacent pit & less footprint


refined design in collaboration with foster + partners








key activities & challenges
following design intent approval